battle programmers alliance

battle programminga forum for elite programmerswith extreme will powerto sharpen theire skills
 
HomeCalendarFAQSearchMemberlistUsergroupsRegisterLog in
Search
 
 

Display results as :
 
Rechercher Advanced Search
Latest topics
» android mobile app dev APK
Sun Jul 15, 2018 6:20 pm by Moti Barski

» android studio execises
Mon Jul 09, 2018 1:43 pm by Moti Barski

» problem with firebase authentication
Thu Jun 28, 2018 9:52 am by Moti Barski

» text art canvas
Wed Jun 20, 2018 8:55 pm by Moti Barski

» links/suggestions to become a programmer
Mon May 07, 2018 11:01 pm by Moti Barski

» java eclipse oxygen grimoire
Thu May 03, 2018 8:24 pm by Moti Barski

» forum logo by tf monkey
Wed May 02, 2018 10:17 pm by Moti Barski

» java and MySQL
Mon Apr 30, 2018 3:02 pm by Admin

» mini A.I puzzles
Mon Apr 23, 2018 11:38 am by Moti Barski

July 2018
SunMonTueWedThuFriSat
1234567
891011121314
15161718192021
22232425262728
293031    
CalendarCalendar
Social bookmarking
Social bookmarking digg  Social bookmarking delicious  Social bookmarking reddit  Social bookmarking stumbleupon  Social bookmarking slashdot  Social bookmarking yahoo  Social bookmarking google  Social bookmarking blogmarks  Social bookmarking live      

Bookmark and share the address of battle programmers alliance on your social bookmarking website
Share | 
 

 updated CNC SETUP AND OPERATION walkthrough

Go down 
AuthorMessage
Admin
Admin
avatar

Posts : 108
Join date : 2011-08-01

PostSubject: updated CNC SETUP AND OPERATION walkthrough   Fri Feb 10, 2012 5:06 am

setup time: last part of prev production, till first good part of current production.
operator cycle time: full production time div number of workpieces.

SETUP:
1teardown:
1.1 clean swarf, (if needed) remove holding devices(clamps)
1.2 remove unneeded cutting tools
1.3 power on control panel, power on machine(to power off first machine then control panel)
1.4 allign new clamps x,y axis to spindle x,y with dial indicator maintaining a constant degree
1.5delete previous cnc program
2 assemble:
2.1 mount holding device (clamp) and align with dial indicator
2.2 assign program zero:
place edge finder on spindle to get x y of zero point according to work sheet.
get z by placing 3inch block on workpiece touch spindle nose to block, add 3 inches to current z
2.3 cutting tools assembly & measurements length, radius which are tool offsets
2.4 before first run increase tool length (by 0.010) for tools to do everything but holes (like pockets), same goes for radius.
2.5 enter offsets, load cnc program with dnc(distributive numerical control)
2.6 varify cnc program and save:
with proven programs go to cycle start
rapid traverse overide - slows program at varification
at first run : activate without workpiece
at second run : activate single step and dry run, then press cycle start after each tool (m01)
at 3rd run: activate single step, rapid overide 10%
cycle start button to start or resume.
make shure the spindle spins BEFORE contacting the work piece, keep finger ready on feed hold button.
if hear ominouse sound you sould use panic button.
the reset key: undo program changes after input, stops process, negates alarm
measurments 1st piece now or every 30 pieces, adjust offsets see get tolerance.

MAINTAINING PRODUCTION:
*from sheet talk to setup person
1 load workpiece (metal casting)
2 start cycle, watch out for tool wea/break

3 replace dull tools
4enter new offsets
5 lub machine

GET TOLARANCE:
x = +n1,-n2 maximun, minimum dimensions
tolerance band = (n1 +|N2|)/2
mean value = x + n1 -(n1 +|N2|)/2
format x=+-n1 is x =+n1,-n1
measure completed workpiece:
if sizes are bigger than corresponding mean value : increase tools offset
if sizes are smaller than corresponding mean value : decrease tools offset

cheats :
MDI, 1 lined gcodes typed on the machine's controlto do stuff :
S speed of spindle(drill), example S 1800
M03- clockwise spin
M04- ccw spin
M05- spindle off
M07- mist coolant on
M08- coolant on
M09 coolant off
T15- ready tool 15
m06-tool change
M60 auto pallet change
check your machine manual for its unique codes

metal also come in sheets which are simpleaand cheap to cut, drill and fold using any basic drills or saws.

_________________
kurayami no kagi  _____    
Back to top Go down
View user profile https://yotamarker.justforum.net
 
updated CNC SETUP AND OPERATION walkthrough
Back to top 
Page 1 of 1
 Similar topics
-
» Eclipse setup with selenium RC
» AVG: The Success of Operation Rainfall.
» [ANSWERED] Setup cannot continue due to corrupted installation file....
» Linux Based Stable Solution for VoIP Business!!
» Linux based VoIP Switch with Integrated Billing only $2/port

Permissions in this forum:You cannot reply to topics in this forum
battle programmers alliance :: battle programming alliance :: battle programming-
Jump to: